Messeturm Basel

Messeturm Basel

starting position:

We have received the order from the company 3M Schweiz GmbH to carry out the film cutting for the largest 3M sun protection film project in Europe.

Challenge:

We measured the entire Messeturm Basel with millimetre precision and then calculated the optimal material consumption. With such a large project, everything simply has to fit. Perfect cut edges, exact cutting dimensions, clean labeling and packaging, as well as safe transport and good storage.

Corner data:

Sun protection film: 3M Prestige 70 Exterior
slide usage: 11155m2

Conclusion:

The project has shown that customized slides offer great added value for large-scale projects. Many thanks to 3M for this great assignment.